Because to the addition of 2,000 MW to the system, power load-shedding would be reduced by 50% in most regions of the nation beginning May 1.
Load-shedding would be gradually reduced in most sections of the nation, with the exception of feeders with limited recovery, according to a Power Ministry official on Saturday.
She stated that Prime Minister Shehbaz Sharif has begun to fulfil his pledge.